Mechanical & Plant Erection
Mechanical installation and erection for power plants and industrial facilities, covering structural steel, plant equipment, tanks, piping, and ductwork.
What We Deliver
Mechanical and plant erection is Trip Guard's core engineering capability and the largest single contributor to our project portfolio. Trip Guard specialises in the precision installation of mechanical systems for power plants, oil and gas facilities, and large industrial installations — covering structural steel erection, plant equipment installation, storage tank erection, industrial piping (small bore through to large bore high-pressure alloy systems), and ductwork for emissions control systems.
Our largest single mechanical scope to date — the 2x600MW Matarbari Coal Power Plant in Bangladesh — represented over RM 344 million in contracted value across plant erection, piping, electrical, and supporting works for Toshiba Plant System & Services Corporation. We have also delivered substantial mechanical scope for the 2x1000MW Jimah East Power Plant in Malaysia for TPSC Engineering.
Structural Steel Erection & Fabrication
Large-tonnage on-site erection with selective fabrication for pipe racks, ESP ducting, and supporting structures.
Plant Equipment Installation
Turbines, boilers, heat exchangers, generators, transformers, pumps, compressors, and balance of plant equipment.
Storage Tank Erection
Above-ground (AST) and underground (UST) tanks for petroleum, chemicals, and water.
Industrial Piping
Small and large bore, alloy steel, stainless, GRP/HDPE for low and high-pressure applications.
Ductwork
Electrostatic Precipitator (ESP) and Flue Gas Desulphurization (FGD) duct systems.
Explore Sub-Services
Detailed Capability Areas
Where We've Delivered
Matarbari 2×600MW Coal Power Plant
Dec 2020 – Jan 2024Bangladesh
Trip Guard's largest single mechanical project — over RM 344 million in contracted value spanning plant erection, piping, structural steel, electrical, and instrumentation works.
- 17,000+ tons of structural steel erection
- 360,000 dia-inch of plant piping
- 11 storage tanks erected (1,100 tons)
- ESP, FGD, and Ash Silo erection
- Steam turbine and balance of plant erection
- Auxiliary boiler erection
2×1000MW Jimah East Power Plant
Nov 2017 – Jan 2021Port Dickson
Substantial mechanical scope delivered across multiple campaigns for TPSC Engineering.
- Steam turbine erection
- Deaerator and overhead crane installation
- 160,000 dia-inch piping
- 350 tons of storage tank erection
Certifications & Standards
Compliance & Credentials
Our work is underpinned by a rigorous commitment to quality, safety, and environmental responsibility. Every project we deliver meets or exceeds the applicable Malaysian and international standards, giving our clients confidence at every stage.
CIDB Malaysia Grade G7
Mechanical & Electrical (M15)
ISO 9001:2015
Quality Management System
ISO 14001:2015
Environmental Management System
ISO 45001:2018
Occupational Health & Safety Management System
ASME B31.1 / B31.3
Power and Process Piping Codes
AWS D1.1
Welding Procedure Specifications
Toshiba-recognised delivery
Certificates of Appreciation, Matarbari