Field Instrument Installation

Pressure, temperature, flow, level, and control instruments.

02

Cabinet and Panel Installation

Control panels, MCCs, and instrumentation enclosures.

03

Internal Cabinet Wiring

Terminations, dressing, and labelling.

04

Coordination

With cable laying and termination scope for end-to-end E&I integration.

Track Record

Where We've Delivered

Matarbari 2×600MW Coal Power Plant

6,244 instruments
Bangladesh

1,255 cabinets and panels installed; 6,244 instruments installed.